ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING OF A NEW PLATFORMING
Project highlights 1,500 t/d [...]
Burgas Refinery FCC Unit Revamping
Project highlights 250 t/d [...]
New Delayed Coking Unit Complex for the Rijeka Refinery
Project highlights 103 t/h [...]
HORIZON PROJECT: ISBL LOT A, VACUUM GASOIL HYDROTREATMENT UNIT DONGES, FRANCE
The objective of HORIZON Project is to increase the capacity of Donges Refinery. The ISBL mainly consists in a VGO Hydrotreatment Unit and a double stage sour water stripper (SWS). The design criteria is based on a throughput of the HDT-VGO Unit of 254t/H. [...]
Hydrocracked Base Oil (HBO) Project
Projects Highlights BASE OIL TREATING, WITH A LOWER ENVIRONMENTAL IMPACT< [...]
New Aromatic Complex Project
Project highlights [...]
Refinery Process Unit Poland
The project is related to a refinery unit upgrading in the Gdansk refinery, in the framework of the EFRA (Effective Refining) Project. The contract includes the implementation of a Delayed Coking Unit (DCU), a Coker Naphtha Hydrotreating Unit (CMHU), a Hydrogen Production Unit (HPU) licensed by KT, together with ancillary units in the premises of the Gdansk refinery. [...]
Refinery Off Gas (ROG) Project Belgium
The first contract relates to the execution on an EPC basis of the new ROG unit, aimed at processing refinery off gases and recovering hydrocarbons consisting of saturated and unsaturated Refinery Off Gases recovery train, new cooling towers installation, dedicated substation and instrument building. [...]
Heydar Aliyev Oil Refinery (HAOR) Modernization and Reconstruction Project Azerbaijan
The scope of the project entails the installation of several new grass root process units, the relevant utilities and storage with the final aim to upgrade the refinery facilities to be capable of processing 7.5 MMTPA of crude oil, while meeting quantity and quality requirements of products both o f [...]
Heydar Aliyev Oil Refinery (HAOR) Azerbaijan
HAOR Modernization Project has the objective to upgrade refinery capacity up to 7.5 Million t/year and to meet Euro 5 standards for all products. KT Proprietary BAT Technology has been selected as part of the HAOR Modernization Project. KT Modified Claus Unit (2 x 30 t/d) followed by a common KT R.A [...]